Open a Clayton property tax bill for 2026-27 and look past the base levy. A few lines down there's a charge tied to Community Facilities District No. 2007-1, and for a residential parcel it comes to $312.84 this fiscal year. Contra Costa County bills it with your property taxes, as a separate line item. The county's tax FAQ lists the first installment as due November 1 and delinquent after December 10.
That line pays for a large share of what buyers mean when they say Clayton feels green. It is also one of the few costs of owning a home here that runs out on a fixed date. The authority behind it ends June 30, 2027, and the only way to extend it is a two-thirds vote. Measure N puts that question to Clayton voters on the November 3 ballot. Contra Costa County Elections lists December 3 as the target date for certified results.
What $312.84 a year actually maintains
City Hall calls the program the LMD, short for its trail and landscaping maintenance district. The City of Clayton's Measure N FAQ lists what it covers: about 2 million square feet of roadway landscaping and irrigation, 515 acres of open space, 2,871 street trees, 27 miles of public trails, and the Clayton Fountain at Oakhurst Boulevard and Clayton Road.
The list of what it doesn't cover matters just as much. The Grove, Clayton Community Park, Lydia Lane Park, Stranahan Park and North Valley Park are not maintained with this tax. It also doesn't fund police, the library, Oakhurst GHAD geologic work, or private fire insurance. So the money goes to the medians, slopes and trail corridors between the parks, the parts of town most people pass every day without thinking about who keeps them up.
The cost breakdown shows why this is hard to replace. In the City's FY2025-26 figures, salaries and benefits ran about $591,243. Water was $277,361, weed-abatement contracts $195,883, and tree trimming $134,620. Watering 2 million square feet of roadside costs nearly as much as the weed-abatement and tree contracts put together, and none of those costs falls when the tax revenue does.
A tax that has had to win at the ballot three times already
Nothing about this arrangement is new. What sets it apart from the general budget is that residents have to reauthorize it on a schedule.
| Period | Authority |
|---|---|
| 1997 to June 30, 2007 | CFD 1997-1 formed |
| FY2007-08 to FY2016-17 | Measure B, under CFD 2007-1 |
| FY2017-18 to FY2026-27 | Measure H |
| FY2027-28 to FY2036-37 | Measure N, if approved |
The City's FAQ says Measure H was approved in 2016. The filed argument in favor of Measure N describes the extensions as happening in 2007 and 2017, which probably refers to when each new period started. Either way, the pattern holds. Every decade, a third of voters plus one can switch off the funding for Clayton's trail network, and the City says the tax "would not continue automatically."
What Measure N would change in the number
If Measure N is approved, the residential charge for FY2027-28 tops out at $354.45. That's $41.61 more than today, an increase of about 13.3%. The City arrives at the figure by applying a 3% CPI adjustment plus a one-time 10% increase to reset the base. The county ballot text gives the same $354.45 ceiling.
From FY2028-29 on, yearly increases would be capped at CPI or 3%, whichever is lower. Each one would need a recommendation from the resident Trails and Landscaping Committee and a Council vote. Any inflation above the cap can't be carried into later years. One filed argument against the measure projects a maximum final-year charge of about $462 and calls the first-year jump excessive. That argument also cites an LMD budget gap of roughly $24,000 for FY2026-27. A second opposition argument suggests volunteer or sponsored alternatives. The rebuttal to it says volunteers can't provide reliable, year-round maintenance.
If the vote falls short of two-thirds
The City's revenue table for the ten-year term has two columns. If Measure N passes, it projects $1,512,000 in FY2027-28, rising to $1,793,195 by FY2036-37. If it fails, every year reads $0. The same presentation says LMD reserves "absorbed several years of costs exceeding revenues" and have "now been substantially reduced." Its closing slide puts it bluntly:
"Without that dedicated funding, the City cannot absorb any LMD service other than required fire mitigation."
That line is from the City's town-hall presentation. It is a stated outlook, not an adopted plan. The FAQ says no post-expiration service plan has been adopted, and any other funding would depend on future Council budget decisions. If the measure falls short, the line on the bill goes away after June 2027. Nobody can say yet what the roadsides and trail corridors would look like after that.
Measure M is a different kind of ask
The same ballot carries a second Clayton question, and it works on different rules. Measure M is a 1% transactions-and-use tax that needs a simple majority. It would take effect April 1, 2027 and stay in place until voters repeal it. It would raise Clayton's sales tax from 8.75% to 9.75%, or to 10.25% if the separate regional transit measure also passes. The ballot language estimates about $1 million a year. The City cites an HdL estimate of about $1.1 million.
M is a general tax, so its money goes into the General Fund for any lawful City purpose. Police, roads and parks appear in the ballot question only as examples. City materials report a revised operating shortfall of about $324,000 for FY2026-27 before reserves, and a projected annual General Fund gap of about $1.18 million by FY2036-37. The arguments against it point to the lack of a binding spending plan and the lack of a sunset.
The two measures come at the same pressure from opposite ends. N is a restricted, parcel-based tax with an expiration date and a two-thirds bar. M is a broad sales tax that needs only a majority. Clayton's general budget is already tight, which is why it can't easily pick up LMD work if N fails.
Two homes at the same price, two different fixed costs
Parts of Clayton carry a second special charge on top of the LMD. The Oakhurst Geologic Hazard Abatement District, formed in 1989, covers the Indian Wells, Keller Ridge and Peacock Creek neighborhoods south of Kirker Pass Road and near Oakhurst Drive. It pays for monitoring, drainage and erosion control, slope stabilization and related work. Owners approved an assessment increase in June 2025. The FY2026-27 maximum rates in the GHAD Engineer's Report, added here to the current LMD charge, look like this:
| Parcel type, FY2026-27 | GHAD max | Plus LMD | Combined |
|---|---|---|---|
| Area 1, public-street single-family | $114.47 | $312.84 | $427.31 |
| Area 1, private-street single-family | $143.09 | $312.84 | $455.93 |
| Area 2, single-family or condo | $304.57 | $312.84 | $617.41 |
| Area 3, public-street single-family | $341.55 | $312.84 | $654.39 |
| Outside the GHAD | none | $312.84 | $312.84 |
A home in Peacock Creek and a similar home elsewhere in town can sell for the same price and still differ in fixed charges.
The dates between now and June 2027
The election dates below come from the county's candidate guide, and the installment dates from the county tax FAQ.
| Date | What happens |
|---|---|
| November 3, 2026 | Election Day; last day to return a vote-by-mail ballot |
| November 25, 2026 | Ballot cure deadline |
| December 3, 2026 | County certification deadline and final results |
| December 10, 2026 | First property tax installment delinquent after this date |
| February 1 / April 10, 2027 | Second installment due / delinquent after |
| April 1, 2027 | Measure M takes effect, if approved |
| June 30, 2027 | Current LMD authority expires |
Who watches how the money is spent?
The Trails and Landscaping Committee, created in 2006, is an advisory body of up to 11 residents. Under Measure N, the revenue stays in a separate account and goes through the City's annual outside audit.
If you'd like a free local market consultation and home valuation, Kelly McDougall can help.